Composting plantZAK
LocationKempten (Germany)
Input materialGreenwaste
Throughput (t/a)5.500
In operation since2016

Composting plant ZAK Location Kempten (Germany) Input material Greenwaste Throughput (t/a) 5.500 In operation since 2016