Project Authority Ordu
| Composting plant | Authority Ordu (10090) |
| Location | Ordu (Turkey) |
| Input Material | Residual Waste – MBT |
| Throughput (t/a) | 6.000 |
| In operation since | 2016 |
Composting plant Authority Ordu (10090) Location Ordu (Turkey) Input Material Residual Waste – MBT Throughput (t/a) 6.000 In operation since 2016













































