Composting plantAWG Calw (10115)
LocationSimmozheim, Germany
Input materialGreenwaste
Throughput (t/a)4.000
In operation since2014

Composting plant AWG Calw (10115) Location Simmozheim, Germany Input material Greenwaste Throughput (t/a) 4.000 In operation since 2014