Composting plantEnviro Waste (10097)
LocationAuckland , New Zealand
Input materialGreenwaste
Throughput (t/a)10.000
In operation since2015

Composting plant Enviro Waste (10097) Location Auckland , New Zealand Input material Greenwaste Throughput (t/a) 10.000 In operation since 2015