| Location | Wodonga, Australia |
| Input material | Greenwaste |
| Throughput (t/a) | 25.000 |
| In operation since | 2013 |
Location Wodonga, Australia Input material Greenwaste Throughput (t/a) 25.000 In operation since 2013
| Location | Wodonga, Australia |
| Input material | Greenwaste |
| Throughput (t/a) | 25.000 |
| In operation since | 2013 |
Location Wodonga, Australia Input material Greenwaste Throughput (t/a) 25.000 In operation since 2013