Project AWG Calw, Walddorf
| Composting plant | AWG Calw, Walddorf |
| Location | Walddorf |
| Input material | Green waste |
| Throughput (t/a) | 4.000 |
| In operation since | 2018 |
Composting plant AWG Calw, Walddorf Location Walddorf Input material Green waste Throughput (t/a) 4.000 In operation since 2018













































